Method & Verification Register

Proven offline and in shadow mode before anything goes live.

Every Nodal engagement follows five gated stages: Design, Offline Replay / Digital Twin, Internal Rival & Code Review, Read-Only Shadow Pilot (with the success threshold signed before day one), and Step-by-Step Rollout.

Construction · For main contractors (Commercial Director & Head of QS)

Site Ledger — FIDIC 28-day notices & subcontractor IPC audit

Stage: In design (no simulation figure is published; an internal synthetic test held only on its generator's wording). Reads structured CSV/Excel exports of one closed subcontract package to flag duplicate Materials-on-Site claims, signed back-charges not deducted and changes that may start a notice clock. Proposed target, set and signed before any data is opened: share of past notices flagged within 2 working days under a false-alarm ceiling. Contracts/legal sign every notice; your QS confirms proposed holds.

Trade · For large importers & retailers (CFO & Head of Customs)

Trade Shield — Mirsal 2 customs deposits & 3-year duty recovery

Stage: In design (no simulation figure published in this register; a read-only engine has run only on synthetic test files from one generator, where it matched no more errors or cash than a strong fuzzy matcher and required input cleaning on mixed dates). Agreed in writing before data moves: automatic line-match share, false-alarm ceiling and every open deposit listed with its deadline (if missed, we stop).

Energy & cooling · For hotel, tower & hospital owners (CFO, VP Engineering or Facilities)

Delta Guard — District cooling Low Delta-T bill & valve audit

Stage: In design (no simulation figure is published; a first simulation on synthetic buildings did not pass in full because a strong engineer's analysis recovered more delta-T, and the first design does not detect open plant-room bypasses). Checks low delta-T and RD10 charges against your agreement (untested on real bills) and ranks night valve suspects. Proposed pilot target, signed beforehand: your engineer confirms on site at least 3 in 4 listed suspects, never padded (fewer than 4 listed are reported, not scored).

Health · For hospital groups (COO & Revenue Cycle Lead)

Instant Auth — DHA eClaimLink prior-approval pre-check

Stage: 4th simulation round closed (not a full pass in internal review; 32 simulated hospitals new to the system: 16 developer + 16 held-back). On top of a hand-kept 8-payer rule list, median total-cost score (staff minutes, waiting and wrong rejections, not money) was 20.3–20.6 vs 21.6–22.0 for the list alone and 20.8–21.2 for the cheapest pre-set comparator (52–54 median manual checks/100 vs 68–69 for the list). Limits: reviewer's model scored 20.5–20.7 (would have failed 5 of 6 comparisons if pre-set); the list alone had higher first-pass completeness (88.0–88.5% vs 87.1–87.6%) and fewer returns (8.6–9.1 vs 10.3–10.6/100); slower at 85% reviewer capacity (164–169 vs 160–163 simulated min); not robust at 20% issue rate with frequent rule churn; payer still decides.

Energy & cooling · For district-cooling providers with chilled-water storage (Dubai's power grid is run by DEWA)

Thermal Battery — District cooling peak capacity & load shift

Stage: Simulated, internal review. Across 28 typical Dubai buildings and two district-cooling districts with storage tanks over 16 summer weeks not used for tuning, daily fleet power peak fell 5.2% on average (5.7 MW of 111 MW) vs thermostats at 23 °C, ahead of a tuned timer's 1.2% (1.3 MW) in all 16 weeks (6.2% vs 3.9% in 13:30–17:30). Limits: fleet electricity (not cooling RT), total kWh fell only 0.16%, untested against an operator's own optimised tank schedule, 1.4–2.2 pt lead without tanks (2 re-run weeks), and tank recharge raised evening demand (+6.0 MW weekly worst 17:30–22:00; +15–17 MW worst 22:00–midnight in 4 re-run weeks).

Roads & transport · In Dubai, signals are run by RTA (Nodal has no agreement with RTA)

Dubai Flow — Adaptive traffic signal control & corridor twins

Stage: Simulated, internal review (own synthetic queue model, two-phase junctions without pedestrian stages). On four Dubai districts, median waiting fell 13% vs standard actuated control (20 tests, win in 18) and 45% vs best-cycle fixed-time; against best-practice actuated control it was level in 19 of 20 tests (worth nothing measurable, with 1–4% more stops), and a junction reflex under a simplified central plan changed nothing in 28 of 28 tests. Not tested under UTC-UX Fusion, on RTA's data or by an outside auditor.

Roads & transport · In Dubai, street-works permits are issued by RTA (Nodal has no agreement with RTA)

Road Scan — Street-works NOC inspection & trench settlement monitoring

Stage: Simulated, internal review (32 runs on 45 synthetic days across 2,688 lane-km; never run on a real road). Re-ordering 12 inspectors' shifts from the permit register alone confirmed 31% of permit breaches for a register-steered planner built in review (Nodal's own zero-taxi planner reached 26%, and 33% with 80 taxi pods) vs 22% baseline. For settling permit-register trenches within 45 days: 26% with 80 taxi pods + 1 van vs 12% for 1 pooling van, while 2 pooling vans without taxis reached 29% at ~2.4× mileage and 3× patrols (8 mm sensor noise drops 26% to 20%).

Roads & transport · In Dubai, signals are run by RTA, paid parking by Parkin & tolls by Salik (no agreement with Nodal)

Corridor Equilibrium — District parking guidance & motorway exit protection

Stage: Simulated, internal review (uncalibrated 10 km corridor model). Sending searching drivers to a neighbouring zone cut evening peak delay 34–37% (median, 32 runs) assuming car parks nearly full and 80% informed — falling to ~20% at 30% lower starting occupancy, 13% at 20% informed, and 5–7% when ~20% full (where off-peak delay rose ~3%; single-zone guidance moved delay 0.1%). Overloaded exit rule cut spillback minutes 98% median and delay 6–7.5% (actuated control with the same 75% ramp rule came within 0.4%), costing +61% cross-street queue, +20–24% search time and +80–93% abandoned searches. Salik tolls untouched.

Energy & cooling · For LPG distributors, gas billing companies & building owners

Gas Shield — Central LPG riser slow-leak & meter discrepancy audit

Stage: Simulated, internal review (100 simulated towers, 120 tanks; untested on a real network). Of 77 slow riser leaks that grew to 0.5 L/min across 16 unseen scenarios (out of 416 total leaks), 75 were flagged before 0.5 L/min vs 56 (or 61 re-tuned) for a night-gap threshold rule, and 184 of 185 (of ~826) vs 130–142 in 32 second-review scenarios. False inspections were 0.81 vs 0.70 per building per year (0.67–0.94 re-tuned; difference not statistically significant). Needs hourly master, flat/shop meters, riser pressure/temperature and as-built riser volumes. No gain is claimed on tanker routing (~2% to 4% more stops vs days-of-cover).

Water · In Dubai, the sewer network is run by Dubai Municipality (no agreement with Nodal)

Water Sentinel — Sewer saline intrusion tracing & H2S scrubber dosing

Stage: Simulated, internal review (synthetic single-station catchment; 64 distinct campaigns: 16 author + 16 held-back + 32 stress seeds). In 32 unseen campaigns, hidden salt inflows were pinned in ~7 nights on average vs 11–15 for an expert moving the same 20 loggers and 19–22 for a fixed station meter (59/64 pinned ≥2 of 3 inflows within 5 nights vs 51/64 within 14 nights for the expert). Limits: with 8 or 4 loggers it made ~4.6 or ~2.8 more wasted checks than the expert; lead over the expert is not statistically clear with a deeper water table, 3-night wasted-check cost or 3× ragging. Scrubber caustic fell 12–13% vs a pH schedule (98% vs 94–97% hours in limit; at 2× sulphide load Nodal's saving fell to 4.5% with 10% hours over limit), while a tuned operator rule used 1–2% less caustic with more hours over limit.

Roads & transport · In Dubai, highway incident management is run by RTA & Dubai Police (no agreement with Nodal)

Incident Zero — Highway recovery staging & incident clearance audit

Stage: In design (no simulation figure is published). An earlier simulation on a five-lane highway and a three-lane arterial is no longer used as proof because its gain came from sending a tow truck at dispatch whenever no camera classified the vehicle — matched on the corridor by a dispatcher applying the same rule manually, with zero earlier alert. Current design focuses on shift-by-shift tow staging and camera driveability triage, with pilot targets agreed in writing beforehand.