← Project library
ConstructionSite Ledger FIDIC 28-day notices & subcontractor IPC audit

Are we paying for the same materials twice?

Your subcontractor was paid for materials on delivery. When installation is claimed, Site Ledger flags any materials balance still on the claim. Your quantity surveyor checks the two certificates before approving payment.

Site Ledger — FIDIC 28-day notices & subcontractor IPC audit

For main contractors (Commercial Director, Head of QS)

Today in the UAE

28 days to notify

FIDIC 2017 Sub-Clause 20.2.1: a claim not notified within 28 days after the claimant became aware, or should have become aware, of the event is time-barred, unless a late notice is accepted as justified. In Panther v MESC [2022] DIFC CA 016, on an amended FIDIC 1999 contract, the DIFC Court of Appeal treated the notice as a condition precedent to an extension of time. Infrastructure takes 48% of Dubai's AED 99.5 billion budget for 2026.

Proof to date

In design

In design: no simulation figure is published. The offline check reads CSV and Excel exports of one closed subcontract package (from Aconex, Oracle Unifier, RIB Candy or spreadsheets). It is designed to flag duplicate Materials-on-Site claims, signed back-charges not deducted and changes that may start a notice clock. Before any data is opened, you set and sign the target: the share of past notices flagged within 2 working days, under a ceiling on false alarms.

How to start

4-week offline back-test · AED 0 upfront

Exports from one closed project or package: notice and correspondence logs, the variation register, payment applications, and inspection, delivery and back-charge registers. They are read on a machine inside your network and stay there. No live Aconex, Unifier or ERP login. Anything later is on terms agreed after the study.

Limits

  • Not yet used on any project. An internal test on synthetic records held only on the wording it was tuned on, which is why no figure is published.
  • It reads structured CSV and Excel exports only, not PDFs, and logs a change only when the export already marks a scope change, a delay or an extension estimate.
  • Its clock runs from the document date, not from awareness. Where the export does not state the notice period it assumes 14 days, and the 84-day detailed claim is not modelled.
  • Under FIDIC 2017 a late notice is deemed valid if the Engineer gives no notice within 14 days, and Sub-Clause 20.2.5 allows a justified late submission. Particular conditions may shorten the 28 days.
  • Panther v MESC (12 May 2023) concerned an amended FIDIC 1999 contract under DIFC law, not FIDIC 2017.
  • It gives no legal advice. Your contracts team or lawyers decide whether a claim is valid or late and sign every notice, and your quantity surveyor confirms every proposed hold.
For main contractors (Commercial Director & Head of QS)

Inside the operating model.

Pilot design

What the first test must prove.

Start at AED 0

2-page executive brief (PDF) ↓1-page read-only CSV checklist (PDF) ↓

Site Ledger field verification
Illustrative image
The decision
Which entries deserve a second look before your surveyor signs the next subcontract payment certificate?
How we would test it
Trace each exception back to the prior certificate, materials register or signed back-charge. The surveyor resolves the item. Finance records any new correction after reversals.
Evidence & target
Stage: In design (no simulation figure is published; an internal synthetic test held only on its generator's wording). Reads structured CSV/Excel exports of one closed subcontract package to flag duplicate Materials-on-Site claims, signed back-charges not deducted and changes that may start a notice clock. Proposed target, set and signed before any data is opened: share of past notices flagged within 2 working days under a false-alarm ceiling. Contracts/legal sign every notice; your QS confirms proposed holds.
A first step (AED 0 upfront)
4-week offline back-test at AED 0 upfront on structured CSV/Excel exports of one closed package, read on a machine inside your network where they stay. Zero live Aconex, Unifier or ERP logins; later terms agreed after the study.

Questions & regulatory scope

Common questions · Site Ledger (FIDIC 28-day notices & subcontractor IPC audit)

Designed to work with: Oracle Aconex · Oracle Unifier · RIB Candy · Structured CSV/Excel BOQs · FIDIC 1999 & 2017 Sub-Clause 20.2.1

How does Site Ledger help commercial teams track the FIDIC 28-day claim notice window?

Site Ledger reads structured correspondence, variation and programme CSV/Excel exports from Aconex or Unifier where scope changes, delays or extension estimates are marked, flagging items that may start a notice clock (from document date) so your contracts team or lawyers decide validity and sign any notice.

What does Site Ledger check on subcontractor payment applications?

Before certification, it cross-checks consecutive subcontractor IPC exports against prior Materials-on-Site claims, inspection logs and signed back-charge registers so your Quantity Surveyor can verify any proposed hold.

Does Site Ledger require live access to our Aconex or ERP environment?

No. The 4-week back-test runs at AED 0 upfront on read-only CSV/Excel exports processed on a machine inside your own network, with zero live logins.