Roads & transportRoad Scan Street-works NOC inspection & trench settlement monitoring

Which reinstated trench needs an inspector today?

Permit dates and earlier inspections can change the value of tomorrow’s route. Use them to decide where the same team should spend its next shift.

Road Scan — Street-works NOC inspection & trench settlement monitoring

For a road authority's inspection team. In Dubai, street-works permits are issued by RTA, with which Nodal has no agreement.

Today in the UAE

AED 30,000 fine

Dubai has more than 25,000 lane-km of roads (Dubai Media Office, 26 Oct 2025). Excavating in a right of way without a street-works NOC carries a fine of AED 30,000, and AED 50,000 without the required concrete barriers (Executive Council Resolution No. 54 of 2021).

Proof to date

Simulated, internal review

In 32 simulated runs, re-ordering inspections from the permit register alone, with no hardware, confirmed 31% of permit breaches against 22% for a register-steered routine. That planner was built by the reviewer; our own system without taxis reached 26%. With sensors on 80 taxis and one van, the system flagged 26% of settling trench repairs on the register within 45 days, against 12% for one van pooling its passes and 29% for two.

How to start

4-week discovery sprint · AED 0 upfront · no hardware

Past street-works permit records and inspection outcomes, under NDA or checked inside your IT, plus a fleet operator's anonymised GPS traces where they exist. No portal login and no hardware. Sensors come later only if the inspection plan beats your current routine, on terms agreed after the study.

Limits

  • Simulation only, never on a real road: 45 days on 2,688 lane-km of mapped central Dubai and synthetic residential streets. Every value is a modelling assumption, none is Dubai data.
  • Two vans pooling their passes, without taxis, flagged more settling trenches than our system (29% against 26%), driving about 2.4 times the mileage with three times the patrols.
  • With 12 modelled inspectors the taxi sensors add about 2 points to confirmed breaches (33% against 31%), and about 4.5 with 8 inspectors.
  • For works past their permitted end date, re-ordered inspections confirmed more breaches than the system (49% against 32% in the reviewer's 16 runs), and breaches where cones stand in for barriers were confirmed slightly less often.
  • A noisier 8 mm sensor cut trench flags from 26% to 20%. Trenches are flagged more often, not sooner, and none that is missing from the register is flagged (today's routine, with low precision, catches some of those).
  • Object types not seen in tuning drew many more false alerts, and the precision of the pods, the emergency-works hold and a 20-vehicle pilot are untested.
  • The rivals were chosen from a handful of configurations and were not optimised.
In Dubai, street-works permits are issued by RTA (Nodal has no agreement with RTA)

Inside the operating model.

Pilot design

What the first test must prove.

Start at AED 0

2-page executive brief (PDF) ↓1-page read-only CSV checklist (PDF) ↓

Road Scan field verification
Illustrative image
The decision
Which sites are worth an early visit, given your open permits, recent closures and available inspectors?
How we would test it
Compare a prioritised route with your existing schedule under the same staff-hour budget. Inspectors confirm defects and decide how to follow up.
Evidence & target
Stage: Simulated, internal review (32 runs on 45 synthetic days across 2,688 lane-km; never run on a real road). Re-ordering 12 inspectors' shifts from the permit register alone confirmed 31% of permit breaches for a register-steered planner built in review (Nodal's own zero-taxi planner reached 26%, and 33% with 80 taxi pods) vs 22% baseline. For settling permit-register trenches within 45 days: 26% with 80 taxi pods + 1 van vs 12% for 1 pooling van, while 2 pooling vans without taxis reached 29% at ~2.4× mileage and 3× patrols (8 mm sensor noise drops 26% to 20%).
A first step (AED 0 upfront)
4-week discovery sprint at AED 0 upfront with zero hardware and zero portal login, using past street-works permit CSVs and inspection outcomes under NDA (plus anonymised fleet GPS traces where kept). Sensors come later only if the plan beats current routines, on terms agreed after the study.

Questions & regulatory scope

Common questions · Road Scan (Street-works NOC inspection & trench settlement monitoring)

Designed to work with: Street-Works NOC Permit CSVs · Inspection Outcomes · Optional Fleet GPS & Pods · Exec. Council Res. 54/2021

What did the zero-hardware permit-register inspection test show?

In 32 simulated runs, re-ordering daily inspections from the permit register with zero hardware confirmed 31% of breaches for the review's register-steered planner and 26% for Nodal's zero-taxi planner vs 22% baseline, while taxi pods added ~2 points on breaches (33% vs 31% with 12 inspectors).

How did taxi pods compare with survey vans on settling trench repairs?

With 80 taxi pods and one survey van, the simulation flagged 26% of settling trenches on the permit register within 45 days vs 12% for one pooling van, whereas two pooling vans without taxis flagged 29% by driving ~2.4× the mileage with three times the patrols.

How does the 4-week discovery sprint start?

At AED 0 upfront with zero vehicle hardware and zero portal logins, building a testable daily inspection plan from historical permit records to compare against your current routine.